Activation electromagnets ER35/C, Electromagnets for Sale

ER35/C

Sosical sharing

ER35/C

New product

Activation electromagnets ER35/C

Ordering availlable. 2 weeks of manufacture.

Volume discounts

QuantityPriceYou Save

39,62 €/ud

Data sheet

Market factorED 100 %
Weight (g)170
Nominal voltage24 V dc

Features:

Protection rate: IP00
Insulation class: B (130ºC)
Cycle duration: 2 minutes
Standard stroke "s": 12 mm
Temperature rise "DV31": 70ºC
Work: pull/push
Incorporated return spring: YES

Duty-cycle ED(%)1004025155
Abs. Power at 20ºC (W)9203560150
Minimum force (N)1.54.37.510.617.3
Max time under voltage(s)4830186
Plunger weight (g)   34
Solenoid weight (g)  170
Duty-cycle ED(%))Standard voltagesUnder demand voltages
VDCVACVDCVAC
6122448100125205110230MinMaxMinMax
100%OOOOOOOOO423036230
40%OOOOOOOOO523075230
25%OOOOOOOOO6230105230
15%XOOOOOOXO8230180230
5%XOOOOOOXX12230XX

Layout::     O= Available;      X= Unavailablee

Force stroke curve:

ER35-C

Solenoid under voltage:

Plano ER35_C(ES)_2

* On request, it can be supplied in any other dimension.

Remarks:

  1. Voltage under demand: They can be manufactured at any voltage between the maximum and minimum voltage values shown in the chart.
  2. To feed in alterning current the solenoid will have a rectifier incorporated in the coil.
  3. The duty cycles described in the chart are standard, they can be manufactured in any intermediate cycle.
  4. If any variation from the original is needed, please ask us.
  5. The terminals can be changed by leads.
  6. Earthing is recommended if the metallic parts are accessible.

Ordering code: ER35/C --V ED---% - Mounting position - Spring


Example:

Standard voltage:24Vdc Duty cycle: ED100%: Mounting position A: With spring : ER35/C 24Vdc ED100% A RS
Standard voltage:12Vdc Duty cycle: ED15%: Mounting position C: Without spring : ER35/C 12Vdc ED15% C RN

 

Imagen ER35C_2

Models with terminals                                                                   Model with wires

 

Related Products

Activation electromagnets ER15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER20/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER21/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER25/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER30/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER45-05/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER45-15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER50-15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-05/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-10/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-20/C

Ordering availlable. 2 weeks of manufacture.