Activation electromagnets ER45-15/C, Electromagnets for Sale

ER45-15/C

Sosical sharing

ER45-15/C

New product

Activation electromagnets ER45-15/C

Ordering availlable. 2 weeks of manufacture.

Volume discounts

QuantityPriceYou Save

43,00 €/ud

Data sheet

Market factorED 100 %
Weight (g)285
Nominal voltage24 V dc
Features: Protection rate: IP00 Insulation class: B (130ºC) Cycle duration: 3 minutes Standard stroke "s": 15mm Temperature rise "DV31": 70ºC Work: pull/push Incorporated return spring: YES
Duty-cycle ED(%)1004025155
Abs. Power at 20ºC (W)12304880240
Minimum force (N)3.37.31015.527
Max time under voltage(s)?6038236
Plunger weight (g)  59
Solenoid weight (g)  285
Duty-cycle ED(%)Standard voltagesUnder demand voltages
VDCVACVDCVAC
6122448100125205110230MinMaxMinMax
100%OOOOOOOOO523034230
40%XOOOOOOOO723086230
25%XOOOOOOXO9230136230
15%XOOOOOOXO11230230230
5%XXOOOOOXX16230XX
Layout::    O= Available;     X= Unavailable Force stroke curve: ER45-15-C   Solenoid under voltage: Plano ER45_15_C(ES)_2* Under request, can be supplied in any other dimension. Remarks:
  1. Voltage under demand: They can be manufactured at any voltage between the maximum and minimum voltage values shown in the chart.
  2. To feed in alterning current the solenoid will have a rectifier incorporated in the coil.
  3. The duty cycles described in the chart are standard, they can be manufactured in any intermediate cycle.
  4. If any variation from the original is needed, please ask us.
  5. The terminals can be changed by leads.
  6. Earthing is recommended if the metallic parts are accessible.
Ordering code: ER45-15/C --V ED---% - Mounting position - Spring Example:
  • Standard voltage:24Vdc Duty cycle: ED100%: Mounting position A: With spring : ER45-15/C 24Vdc ED100% A RS
  • Standard voltage:12Vdc Duty cycle: ED15%: Mounting position C: Without spring : ER45-15/C 12Vdc ED15% C RN
 
ER45_15_C_2

Model with terminals                                                        Model with wires

Related Products

Activation electromagnets ER15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER20/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER21/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER25/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER30/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER35/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER45-05/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER50-15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-05/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-10/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-20/C

Ordering availlable. 2 weeks of manufacture.