Sale!
ER60-05/C

Activation electromagnets ER60-05/C, Electromagnets for Sale

ER60-05/C

Sosical sharing

ER60-05/C

New product

Activation electromagnets ER60-05/C

Ordering availlable. 2 weeks of manufacture.

Volume discounts

QuantityPriceYou Save

72,90 €/ud

81,00 €

-10%

Data sheet

Market factorED 100 %
Weight (g)650
Nominal voltage24 V dc
Features: Protection rate: IP00 Insulation class: B (130ºC) Cycle duration: 5minutes Standard stroke "s": 5mm Temperature rise "DV31": 70ºC Work: pull/push Incorporated return spring: YES
Duty-cycle ED(%)1004025155
Abs. Power at 20ºC (W)184570110280
Minimum force (N)718284796
Max time under voltage(s)?120754515
Plunger weight (g)  117
Solenoid weight (g)  650
Duty-cycle ED(%)Standard voltagesUnder demand voltages
VDCVACVDCVAC
6122448100125205110230MinMaxMinMax
100%XOOOOOOOO723048230
40%XOOOOOOXO11230125230
25%XXOOOOOXO13230200230
15%XXOOOOOXX16230XX
5%XXOOOOOXX24230XX
Layout::    O= Available;     X= Unavailable Force stroke curve: ER60-05-CSolenoid under voltage: Plano ER60_05_C(ES)_2* Under request, it can be supplied in any other dimension. Remarks:
  1. Voltage under demand: They can be manufactured at any voltage between the maximum and minimum voltage values shown in the chart.
  2. To feed in alterning current the solenoid will have a rectifier incorporated in the coil.
  3. The duty cycles described in the chart are standard, they can be manufactured in any intermediate cycle.
  4. If any variation from the original is needed, please ask us.
  5. The terminals can be changed by leads.
  6. Earthing is recommended if the metallic parts are accessible.
Ordering code: ER60-05/C --V ED---% - Mounting position - Spring Example:
  • Standard voltage:24Vdc Duty cycle: ED100%: Mounting position A: With spring : ER60-05/C 24Vdc ED100% A RS
  • Standard voltage:48Vdc Duty cycle: ED15%: Mounting position C: Without spring : ER60-05/C 48Vdc ED15% C RN
 
Imagen ER60_05C_2

Model with terminals                                                               Model with wires

Related Products

Activation electromagnets ER15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER20/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER21/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER25/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER30/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER35/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER45-05/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER45-15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER50-15/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-10/C

Ordering availlable. 2 weeks of manufacture.

Activation electromagnets ER60-20/C

Ordering availlable. 2 weeks of manufacture.